Phase 2 is in full swing at the Key Chevrolet project in Perry, FL!
We’re moving forward with a brand-new 3,000 SF pre-engineered metal building, featuring 7 bays, including 4 wet detail bays, 2 dry bays, and an alignment rack bay. This phase includes a full electrical package, concrete, MEP, overhead doors, and more!

